Project Hybrid I
Test Fire Photos


Motor Prep
Preparing the motor for the static test. Jeff, Matt and Steve put the fuel grain into the combustion chamber.


Motor Stand
Preparing the stand for the static test. Jeff, Matt and Kip make sure the plumbing for the nitrous is setup.


Data Acquisition System
Preparing the data acquisition system for the static test. Mark makes sure the computer is reading data from the load cell before the test.


MASA Team
Some of the MASA members pose for a picture before the static fire.


Finished Set-Up
The test cell all ready to go. The aluminum cylinder to the right is the oxidizer supply tank and the green frame is the test stand. Note the wires coming out from the test stand. The wires control the action of the pyrotechnic igniter and the oxidizer's solenoid valve.


Motor Fire
A picture of the test stand during the firing of the hybrid motor.


Post-fire
A picture of the combustion chamber and the spent fuel grain after firing.