NYOS-MONOUN
DEGASSING PROJECT (NMDP) Advisory
Committee Report Report
of the Meeting Held at the Institut de Physique du Globe, Paris, France,
19-20 March 2000 Committee
Members: Alain
Bernard (Belgium), Bill Evans (U.S.A.), Michel Halbwachs (France),
George Kling (Chair, U.S.A.), Minoru Kusakabe (Japan), Jean-Christophe
Sabroux (France), Greg Tanyileke (Cameroon), Klaus Tietze (Germany). Participants:
Yutaka Yoshida (Japan) EXECUTIVE
SUMMARY
Two
disasters at Lakes Nyos and Monoun in Cameroon in the 1980s resulted in
the deaths of about two thousand people. The loss of cattle and farmland
and the resettlement of another two thousand survivors, now refuges from
their homes for almost 14 years, has brought much suffering to the
people of Cameroon. The disasters occurred when clouds of carbon dioxide
gas that were stored in the lakes were suddenly released, suffocating
everything in their paths. Both lakes still contain dangerous and ever
increasing amounts of gas. Scientists have proposed and tested a method
to remove the gas in a controlled manner by pumping through pipes
inserted in the lakes. An international Advisory Committee for the
Nyos-Monoun Degassing Project (NMDP, coordinated by the Cameroonian
government) met in March 2000 to evaluate the scientific and technical
information about the lakes and the plans to eliminate the hazards. The
Committee's report recommends a single, unified plan regarding the
degassing operation, safety and security issues, and the education and
training required by the large-scale degassing and hazard mitigation of
the lakes. I.
INTRODUCTION
History
of the NMDP Advisory Committee In
1987, just following the 1986 gas disaster at Lake Nyos, the first
International UNESCO Conference on the disaster was held in Yaounde,
Cameroon. A group of scientists attending this conference created an
organization named the International Working Group on Crater Lakes (IWGCL).
The purposes of IWGCL at that time were to exchange scientific
information about the gas disasters, to coordinate the follow-up field
work that was planned by those interested in these hazards, and to
organize scientific meetings as a forum for further studies. In 1990 the
first official meeting of the IWGCL was held in Nancy, France. At this
meeting a consensus was reached regarding the causes of the gas
disasters and the strategy for reducing the hazards by gas removal, and
a letter to this effect was published in the journal Nature
(v.348, p.201, 1990). A second international meeting was held in 1992 in
Paris, France, and included not only scientists but also engineers
interested in the specific technologies of degassing. Again, a consensus
was reached on the scientific explanations for these events and on the
technical means of a degassing project. After this meeting, and a
similar conference held in Misasa, Japan in 1992, the IWGCL was expanded
and received the status of Commission on Volcanic Lakes (CVL) in 1993,
as granted by the International Association of Volcanology and Chemistry
of the Earth's Interior (IAVCEI).
Between
1992 and 1995, the field demonstration projects for degassing that were
carried out in Cameroon, and the proposals for degassing projects
presented to various funding agencies, have followed the general
consensus reached during the two meetings in France attended by members
of the CVL. Once the field tests showed that controlled degassing was
possible, in 1997 the CVL worked to establish an international committee
to help coordinate and advise any future degassing efforts. This
committee, named the NMDP Advisory Committee (Nyos-Monoun
Degassing Project), is composed of 8 members from six countries, as
listed above.
In
October of 1999 the Cameroonian government formed an Inter-Ministerial
Committee that is responsible for all degassing efforts on Lakes Nyos
and Monoun. Shortly after that, the Inter-Ministerial Committee
requested an update on the scientific and technical aspects of degassing
from the NMDP Committee. The response of the NMDP Committee is contained
in this report, which summarizes the discussions held at a meeting in
Paris, France in March of 2000.
Current
Status of the Lakes It
is important to know the current gas content of the lakes, and how the
gas content is changing. As long as the lakes contain large quantities
of dissolved gas they could potentially release lethal amounts of gas
without warning. A key factor in estimating the likelihood of a gas
burst is the degree of gas saturation (the ratio of gas pressure to
hydrostatic pressure) at various depths in the lake. Several different
methods have been used to measure the gas content, and all methods show
good agreement and have established that the gas pressures in the lakes
are high and are steadily increasing.
On
the basis of the last field results available from 1999, in Lake Nyos
there has been a gas pressure increase at all depths below 170 m
compared to previous measurements. The largest increases have occurred
in the bottom 20 m of the lake. Gas pressure at lake bottom exceeds 13
bar, which represents just over 60% of the saturation value based on an
ambient hydrostatic pressure of 21 bars. In Lake Monoun gas pressure has
increased in waters below 60 m depth and now reaches about 83% of the
saturation pressure at that depth. Fortunately, the rate of pressure
increase in Lake Monoun is less than the rate of increase in Lake Nyos.
The fact that present day gas saturation is less than 100% does not
indicate that the lakes are safe. Any large disturbance of the water
column such as a landslide, rockfall, or violent storm could trigger a
release of the gas remaining in these lakes at any time.
Current
Status of International Projects and Funding
The
scientific study of these gas-charged lakes has a long history, due
mainly to projects supported by German, French, American, Japanese, and
British governments beginning after 1986. A series of technical test
projects aimed at degassing the lakes began in 1992 at Lake Monoun and
was continued in 1995 at Lake Nyos (led by M. Halbwachs). From 1986 on,
and especially after the success of the test projects, larger proposals
for full-scale degassing of the lakes were submitted by German (Tietze,
1986-7), French (Halbwachs et al. 1995-6), and Japanese (Kusakabe et al.
1997-8) scientists. Although the entire, full-scale proposals were not
realized, work on the lakes continued. The eruption of Mt. Cameroon in
spring of 1999 led to an increased international awareness of the
natural hazards in Cameroon, and at that time the U.S. government
requested a proposal to work on the hazards of the lakes. This U.S.
proposal (including principal investigators from Cameroon, France,
Japan, and the U.S.) was funded by the Office of Foreign Disaster
Assistance (OFDA) in late 1999. Shortly after this the French Embassy
signed a contract with the Cameroonian Ministry MINREST for the
degassing, to be coordinated with additional funds from the Cameroonian
government. In addition, the Cameroonian Inter-Ministerial Committee,
which has the overall responsibility for all degassing efforts, has
committed funds toward the necessary infrastructure such as road
improvement, construction of heliport, observatory, and storehouse
buildings at both lakes, vehicles and other transportation including
boats, as well as other logistical costs. The current financial support
available is sufficient to install the initial pipes and begin degassing
operations in both lakes, although further funds will be necessary to
install the total number of pipes required to safely reduce gas levels
in the lakes within ~5 years. II.
DEGASSING OPERATION
Short
Term In
the short term the main objective is to install pipes that will remove
gas at a rate that is faster than the natural rate of gas recharged into
the lakes each year. This will insure at a minimum that the gas
pressures are gradually reduced, and that the danger of another gas
burst is reduced. The NMDP Committee recommends a single degassing plan
which incorporates all presently available resources from the
Cameroonian and international participants. This plan will use at least
one pipe in Lake Monoun (up to 2 or 3 total) and one pipe in Lake Nyos
initially. The technical details of the plan are presented in Section
VIII below.
The
timetable for this plan is to construct the necessary equipment, test
the equipment, and ship the equipment and supplies to arrive in Cameroon
no later than 1 October 2000. The installation will proceed immediately
and will be completed by the beginning of February 2001. Successful
completion will require: (1) Customs clearance for equipment and
supplies arriving in Cameroon; (2) Improved roads to both Lakes
Monoun and Nyos; (3) Transportation to the lakes of materials and
personnel by truck and 4-wheel drive vehicle; (4) Construction of
a storeroom building for supplies and technical work at each lake; in
addition the electrical lines should be extended to Lake Monoun; and (5)
Military assistance and SCUBA equipment for security and safety at each
lake. This includes having an observer on site, closing the road at the
inlet of Lake Monoun, restricting fisherman from Lake Monoun, and
compensating the fisherman while they are unable to work during the
initial degassing.
Long
Term In
the long term the main objective is to remove the gas from the waters in
both lakes. This will result in elimination of future gas releases from
gas stored in the bottom waters of the lakes. As with the short-term
plan, this long-term plan will require a single, unified project that
will fit into the overall program of the Inter-Ministerial Committee.
This project will increase the number of pipes in order to reduce the
gas pressures to safe levels as quickly as possible. We will employ the
same techniques used in the short-term plan. Given our current
scientific and technical understanding, this project will have a time
frame of up to 5 years. It is essential that any proposals to national
or international funding agencies be incorporated into this unified
project.
Based
on our experience, it is imperative for the successful funding of
international proposals that the long-term degassing plan is nominated
by the Cameroonian government as the number one priority for foreign
assistance. Both the short-term and long-term plans also include a
substantial component of education and technical training that must be
accomplished in order to make the transition from high foreign
participation to mainly Cameroonian maintenance of the degassing
operation (see Section IV on Education below). III.
SAFETY AND SECURITY We
recommend following the same safety measures that were used during the
previous degassing tests at Lakes Nyos and Monoun. At Lake Monoun, the
Cameroonian military evacuated people from low-lying areas around the
lake during the tests. At Lake Nyos, evacuation to higher ground was
accomplished through arrangements made by the security team. During both
tests, the Cameroonian military (Marines) supplied compressed air masks
(SCUBA) that were available for all participants. Although there will be
an automated warning system in case of disruption of flow in the pipes
(see Section VIII, Technical Plans), we recommend having at a safe
location a permanent, trained observer on site at both lakes to monitor
the operation of the degassing equipment and to respond to needed
modifications of the operation.
At
Lake Nyos, it is worth noting that the areas below the lake are
officially off-limits now. A thorough sweep of the area should be made
before the degassing operation commences, but once the piping has
proceeded for several days, it should be sufficient to spread the word
through local chiefs and officials that the area should remain evacuated
until the gas content in the lake is greatly lowered. Given the
cooperation of local people in our past efforts and the official
off-limits territory, there should be no difficulty with this
precaution.
At
Lake Monoun, the people living near the lake are actually in danger now.
At a minimum, they should be warned about the dangers. As discussed
below, we will work with the local government and agencies such as the
International Red Cross and U.S. Peace Corps to educate those living
near the lake. During the degassing process there will be a CO2
monitoring system that produces a warning signal if the concentrations
in the air near the town of Njindoun reach dangerous levels. Before this
installation, properly educated people could probably flee to high
ground (nearby on two sides of the lake) fast enough to escape death
should a release occur before the degassing operation begins. Also, the
piping should reduce the hazard at a fairly fast rate, so the local
populace will receive a faster benefit from the mitigation. Given our
calculations of flow rates in the installed degassing pipes, in a few
years there should be no real hazard of gas release at Lake Monoun. The
fishermen who work directly on the lake present the biggest concern.
While it may be impossible or unfair to keep them from their livelihoods
during the entire degassing period, they must be educated to stay away
from the pipe area. Our experience is that they will be quite reasonable
and supportive of our efforts if they are properly compensated for the
disruption of their livelihoods.
Finally,
it should be noted and accepted that these lakes are currently very
dangerous and that a sudden and catastrophic release of gas could occur
at any time. However, in our review we found that all evidence and
calculations to date indicate that the proposed hazard mitigation, and
the actual process of controlled degassing, will not increase the
likelihood of another sudden gas release. IV.
EDUCATION AND TRAINING
Short
Term In
the short term there are two priorities. First there must be education
of target groups living close to the lakes. This education is necessary
to inform local populations about the risks associated with the lakes,
about the general methods that will be used to reduce these risks, and
about the cooperation that is needed during the degassing such as
temporary evacuation and avoidance of pipes and platforms on the lakes.
The NMDP Committee recommends that the Cameroonian government produce a
small pamphlet, with input from scientists, that can be distributed to
the target groups. The distribution of this pamphlet should be
coordinated with "town meetings" to answer specific questions
about the degassing program. There appears to be both money and
personnel available through the International Red Cross and the U.S.
Peace Corps to facilitate this program of education in collaboration
with the appropriate Cameroonian Ministries. In addition, because
concerns about the hazards of these lakes are so widely spread
throughout Cameroon, there should be a one page "poster" that
is produced that describes the general degassing project. This poster
can be distributed and displayed in central, public areas throughout
Cameroon.
The
second priority is to train technicians for the immediate tasks
associated with installation of the pipes this year. This will require
Cameroonian government funds to support the current technical force
available (that is, the small number of people who have worked with the
international community in the past), and to support the initial stages
of training more students and technicians who will continue the
monitoring and maintenance of the program in the long term.
Long
Term In the long
term, all of the tasks associated with the degassing will need to be
assumed by Cameroonian scientists and technicians. Thus there must be a
program of training and higher education of the next generation of
scientists, engineers, and technicians. Overall, this program on the
lakes offers a wonderful opportunity for young Cameroonians interested
in science. For example, there are many different projects for students
such as monitoring the biology, chemistry, and physics of the lakes
during and after the transition from high gas to low gas contents. In
addition, the international community is able to offer technical
expertise and training for students, especially if the Cameroonian
government provides support for both short and long-term
training in Europe, Japan, or the U.S. V.
USE OF DEGASSED CO2 There
are two potential uses of the degassed CO2
from these lakes. The first is scientific and the second is commercial.
The NMDP committee has expertise in the potential scientific uses of CO2,
and our discussion here is centered around those uses and issues. The most exciting possible use for the degassed CO2 is in a CO2-enrichment experiment. Human activities on earth have been increasing greenhouse gases and the CO2 content of the atmosphere, and this increase will continue into the future and will change our climate. Because of this, there has been a tremendous amount of research on how natural ecosystems respond to elevated CO2 concentrations. The current state-of-the-art research projects in this area are called Free Air CO2 Enrichment, or "FACE" experiments. FACE experiments use large volumes of CO2 blown across large plots of vegetation. The range of CO2 required is from ~3,000 to 9,000 metric tons per year, and the U.S. cost is about $60 to $95 USD per ton. The estimated pumping rate of one 13 cm pipe in Lake Nyos is ~30,000 tons per year, which would be sufficient for a FACE experiment. The length of time that this amount of gas is required would be from 8-10 years. Thus a research group interested in conducting a local FACE experiment would have the benefit of using the CO2 from Nyos. The advantages of using CO2 from these lakes are (1) the CO2 has a distinct 14C and 13C signature, (2) the high purity (ethylene-free) CO2 is readily available, and (3) it is a tropical setting and there is a great need for more information on the response of tropical systems to increased atmospheric CO2. The main drawback for establishing a FACE experiment near Lake Nyos is that these experiments also require a substantial amount of power. The expense of this power is from ~$3,000 to $10,000 USD per year. Thus a small scale experiment seems more readily feasible at Lake Monoun because it is closer to power distribution lines. The
commercial uses of the gas may be varied, and could include technical or
industrial applications. The drawback to these commercial uses is the
remote location of the lakes, especially Lake Nyos, and the lack of
electrical power at the sites. Power would be needed to construct an
extraction and bottling plant. The other costs associated with
commercial use must include the transportation from the lakes to
industrial centers.
At
present, it appears that there are no large, immediate financial rewards
for the use of the gas contained in these lakes. Although the potential
for scientific and commercial use should continue to be explored, we
find no indication that the degassing project should be delayed. Neither
will the degassing scheme be too much complicated by the eventual use of
the discharged gas. Once the main degassing is nearly ended, a small
pipe could be maintained in the lakes that reaches a bottom layer of 1-2
meters thick that still contains high pressures of gas (which would
power the extraction). This would maintain a smaller source of CO2
for longer periods of time. VI.
ENVIRONMENTAL ISSUES The
main potential impact on the environment of the lakes will be from the
release of anoxic, saline bottom water at the surface. However, the data
gathered to date on these lakes indicate that these impacts will be very
small. Because the driving force for fluid flow in the pipes is CO2
exsolution, flow rates will be highest during the initial stage of
degassing and will decrease with time as the concentration of CO2
in the bottom water decreases. The initial flow rate of water in the
pipe from the bottom to the surface of Lake Nyos will be at most
1,700,000 cubic meters per year (1.7 x 106 m3/yr).
This water will be somewhat dispersed at the surface of the lake due to
the piping design, but more importantly it will be mixed into and
diluted by the surrounding surface water. In Lake Nyos the upper 45 m of
the water column mixes with the atmosphere each year and contains about
6 x 107 m3 of water. Thus, in the first year the
discharge water would be diluted by about 50 times. But in fact the
dilution is much greater because of the turnover of water in the surface
of the lake due to flushing. Based on rainfall records, drainage basin
area, and our stream gauging results, Tuttle et al. (1992) calculated
that the freshwater input to the lake surface is about 2.4 x 107
m3/yr, or 14 times the flow rate of bottom water in the pipe.
Therefore, the surface water down to 45 m flushes completely out of the
lake in a little more than two years, and with this high turnover rate,
the dilution factor for degassed water is large enough to prevent
serious ecological perturbations or harm.
At
Lake Monoun the flow of the Panke river into and out of the lake has not
been gauged to our knowledge, but based on rainfall records must be at
least as large as the freshwater throughput at Lake Nyos. At the same
time, the discharge rate of bottom water through one 13 cm pipe should
be about 3/4 of the rate in Nyos, suggesting that the ecological
consequences will be smaller than in Lake Nyos. Many
Cameroonian lakes (e.g., Wum, Manengouba, Barombi Mbo) have occasional
overturns where anoxic water reaches the surface, and although fish
kills have been reported, the fish populations recover. It is unlikely
that substantial fish kills could occur as a result of the anoxic water
brought to the surface during the degassing. For example, no fish kills
were observed during the test degassing at Lake Monoun in 1992, and
because water below 5-7 m in the lake is normally anoxic, fish in the
lake are accustomed to living with anoxic water in close proximity. The
fish in Monoun can survive short periods of exposure to anoxic water, as
has been shown for other cichlid fishes. Finally, the fish populations
recovered fine after the 1984 gas burst in Lake Monoun, possibly due to
the fact that there are three basins in Lake Monoun, only one of which
contains high concentrations of gas. The fish in Lake Nyos were recently
introduced by a French scientist, and are not used substantially by the
local population. The threat of anoxic water causing fish kills in Nyos
is less than found in Lake Monoun because of the larger volume of an
oxygenated upper mixed layer of water in Nyos.
The
actual discharge rate of CO2 (considering
CO2 as a greenhouse gas
pollutant) from a single pipe at Lake Nyos is no more than the CO2
discharge rate of a 1.2 MWe production by a coal-fired power plant. In
addition, because of the isolated nature of this discharge and the rapid
mixing of the gas with surrounding air, there should be no problem with
local pollution. There are also no other pollutants such as hydrogen
sulfide or nitrous oxides that will be released in substantial
concentrations from the lake. The
monitoring equipment that has been and will be installed on both lakes
will be able to detect small changes in the temperatures and salinity of
the water, the gas concentrations in the bottom waters, and the
stability of lake stratification. Any changes in these parameters will
alert us to the fact that the anoxic water may be moving toward the
surface or that the salinity of the surface water may be changing.
Periodic measurements of a full suite of chemical and biological
parameters will also be used to track any potential changes in the lakes
that occur during degassing. VII.
ISSUE OF THE DAM The
natural spillway or dam at Lake Nyos is composed of loosely consolidated
volcanic material. The exact composition and age of dam materials is
unknown. However, the structure is weak, and when the dam fails it will
generate a tremendous flood that could empty the upper 40 m of Lake Nyos
and reach into Nigeria. What is currently needed is an expert evaluation
of how to address this hazard. There are at least two possibilities; the
first is to use "jet-grouting" to stabilize the dam, and the
second is to draw down the level of the lake and use horizontal drilling
to change the outflow so it is below the weak dam. We recommend that the
Cameroonian government facilitate a study on the dam by an NGO as soon
as possible (there is one French organization, Hydraulique Sans Fronti�re
(HSF), that we are aware of with the appropriate expertise). Regardless
of the option of removing the potential flood hazard, it is necessary to
first remove the gas from the lake. Once the bulk of the gas has been
removed, remediation on the dam could begin. If possible it will be best
to keep the level of the lake stable so as not to depressurize any gas
contained in pockets or dissolved in groundwater beneath the lake.
However, if there is no alternative and the lake level must be lowered,
the process must be done slowly and carefully with enough time to let
the system come to a new steady state before proceeding. VIII.
TECHNICAL PLANS The
design of the degassing system (pipe, valves, sensors, and actuators)
has been decided on. The design will be almost identical to the design
used in previous degassing demonstrations, successfully carried out at
Monoun (1992) and Nyos (1995). Based on various safety considerations,
we have decided on the following:
(1)
Pipe material. The
most important potential hazard is the failure of the pipe at some depth
during the degassing process. Should this occur, bubbles will escape in
the open water and could trigger an uncontrolled gas release. Therefore,
the pipes must be made up of a very ductile material (in contrast with
brittle ones). The high density polyethylene we have chosen combines
several important advantages, including (a) very pliable (lengthening
above 200% at break point), (b) neutral buoyancy (density 0.96 g/cm3),
and (c) easy to cut and to weld. With the polyethylene pipe this
potential hazard of pipe breakage at depth is virtually eliminated.
(2)
Automatic reduction or shut-down of the degassing in case of problems. It
may become necessary to reduce the gas flow or to shut-down the gas flow
at some time during the degassing. We will use the automatic opening of
a lateral valve to accomplish this shut-down. It is not possible to
actually close the pipe rapidly (either at the top or bottom), because
the trapped gas will generate a buoyancy force (Archimedian, lifting the
whole pipe) which will not be counteracted by the ballast attached to
the pipe. Because the flowing stream of gas and water creates a steady
low pressure inside the pipe, the opening of a lateral valve at a
suitable depth will cause the external, gas-poor water to enter the pipe
and mix with the gas-rich water. This will result in a decrease of the
energy associated with the gas coming out of solution. The water and gas
jet will thus be slowed down, and the mechanical stress on the pipe
structure will return to a harmless level. The former full strength jet
can be reactivated simply by shutting the lateral valve.
(3)
Real-time monitoring of the degassing system operation. The
data gathered by the monitoring systems will check the proper
functioning of the self-siphon process using various technological
sensors: (a) two to three measurements of flow rate and/or flow velocity in the
monophasic liquid part of the upward gas jet; (b) static pressure (depth) at the bottom of the pipe.
If at least two of these control parameters
show a significant change, the rate of degassing will be automatically
and instantaneously slowed down by opening the lateral valve. At this
point there is a need to evaluate the cause of the shift in the
measurements, including on-site inspection. This process leads to the
decision to either restart or shut down the degassing system. In
addition to these main safety concerns listed above, the thermal
(temperature) and chemical (conductivity and CO2
concentration) profiles of the water column, and their changes with
time, will be monitored continuously during degassing. Temperature
profile measurement will be carried out as close as possible to the pipe
and will be concentrated on depths near the thermocline and at the lower
pycnocline (density boundaries). These measurements will evaluate the
impact of the ongoing degassing on the stratification and stability of
the water column. Water electrical conductivity (salinity) sensors will
be attached to the bottom of the pipe in order to monitor the water
inflow gas content; this technique uses a relationship between the gas
content and the salinity of the water. We will also continuously
determine the CO2
concentration of the water taken in at the bottom of the pipe by
measuring the volume of CO2
degassed at the surface per volume of water. The
data generated during the monitoring of the degassing will be
transmitted by satellite for real-time monitoring of the degassing
progress. This transmission system will have bi-directional capability,
so that the valves may be operated remotely.
Finally,
the NMDP Committee determined that certain studies not currently being
made by project personnel would be very helpful in the technical
understanding and mitigation of these natural hazards. These studies
include (a) measurements of radon concentrations in the lakes to
serve as a tracer of gas inputs and gas cycling, and (b) in-situ
density measurements of the lake water. IX.
DATA DISSEMINATION AND MEDIA ISSUES The
project will generate a large amount of information and data, and there
are both internal and external considerations of the proper use of these
project data:
(a)
Internal. At least 3 computer
sites (Cameroon, France, U.S.) will contain all the data generated in
the experiment, and all project personnel can freely access all data.
Potential projects associated with the degassing to be done by students
should be presented first to the advisory group to make sure that they
are compatible with the program. All student data will be available to
project personnel for use in maintenance of the degassing system.
Students will have primary responsibility for their data in terms of
publication in external, peer-reviewed journals.
(b)
External. All reports of
primary data to the media (or postings on a Web site) must be cleared by
the advisory group. General information such as the relative rate of
degassing, the number of pipes in operation, and so forth can be given
to the media at any time. Project data to be presented in a published
scientific record (such as a note to Science or Nature) or
in a peer-reviewed article in a scientific journal must be cleared by
the advisory group. There
are also various issues with the media (reporters, film crews) that are
a concern in this operation, and we advise that two recommendations are
followed:
(1) There is open access for all media members from both Cameroonian and
international agencies; no person or group should receive
"exclusivity rights" that would prohibit open access to
filming or interviews with project personnel. Widespread Press coverage
will be beneficial for the program. Interested media should contact the
Inter-Ministerial Committee to communicate their desire to report on the
degassing and to receive a permit.
(2)
Media personnel or groups with permits should be offered transportation
to the lakes separately from the scientific equipment. Once on site,
there should be a "media tent" or area where the media
personnel can be located. A schedule should be made that allows the
media access to project scientists and technicians during specific, set
times during the day. A balance must be found between access and
interference. This
report is provided by the NMDP Advisory Committee, and may be viewed at
the Web site http://www.umich.edu/~gwk/research/nyos.htm.
This web site will also be linked in the future to the web site of
MINREST in Cameroon.
NMDP
Advisory Committee:
Alain
Bernard, Belgium. [email protected] William
Evans, United States. [email protected] Michel
Halbwachs, France. [email protected] George
Kling, (Chair), United States. [email protected] Minoru
Kusakabe, Japan. [email protected] Jean-Christophe
Sabroux, France. [email protected] Gregory
Tanyileke, Cameroon. [email protected] Klaus
Tietze, Germany. [email protected]
|